Fri, 30th November 2007
Pc Harrington Contractors Ltd V Multiplex Constructions (Uk) Ltd
The sub-contractor was not entitled to the declaration it sought, namely that the contractor would not be entitled in the adjudication it had begun against the sub-contractor to recover damages in respect of its claim that the sub-contractor was in breach of contract by producing defective floors